Výsledky vyhľadávania: 3 pracovné ponuky

2250 €

 ...Secure KPIs such as availability, MTTR, MDT, MCBF, costs, safety etc. in close co-operation with the cross-functional team;  Setup of Bill of Materials, spare parts list, and maintenance program, disturbance-solving instructions;  Contribute to an optimal set-up of the... 

Volvo Car Corporation

Košice
Pred 5 dňami

2055 €

 ...collection, update, and optimization of a clear, complete and user-friendly specific documentation (inclusive visual factory). Setup of Bill of Material, spare parts list, and maintenance program, disturbance solving instructions. •    The definition and management of the... 

Volvo Car Corporation

Košice
Pred 5 dňami

2055 €

 ...Secure KPIs such as availability, MTTR, MDT, MCBF, costs, safety etc. in close co-operation with the cross functional team. Setup of Bill of Material, spare parts list, and maintenance program, disturbance solving instructions Contribute to an optimal set-up of the... 

Volvo Car Corporation

Košice
Pred 5 dňami